RETAIL & WAREHOUSING PROJECTS

Sainsbury's Project

Sainsbury’s, Clifton, Bristol, 470T
Wates

A complex project as Sainsbury’s needed to refurbish the existing store while it was kept open. The project required constructing a new car park and an atrium, using 470T of steelwork.
View more images for this project

Great Western Designer Outlet Centre Project

Great Western Designer Outlet Centre, Swindon, 700T
Carillion

This fascinating project turned the historic Great Western Railway Works, built by Brunel in 1843, into one of Britain’s largest and most attractive shopping malls. It has over one hundred designer label stores in a million square meters of floor space. The project required 700T of steelwork. To avoid altering the existing grade II listed building, neither welding or drilling of the existing steel was permitted. We therefore develpoed innovative connections, including circular clamps around the existing tapered cast iron columns.

Matalan Project

Matalan, Bristol, 84T
Stradform

Matalan needed an 84T steelwork mezzanine built in an existing store within 7 weeks from order. We designed, fabricated and delivered it in 4 weeks and erected it in 3. The site work was complex as new columns were needed to support the roof before the existing trusses were moved to provide the retail headroom needed.

Mercedes Project

Mercedes Benz, Plymouth and Weston-super-Mare, 60T and 50T
Midas, Pearce

One was 60T and the other 50T. Both are attractive buildings based on portal frames.

2 Warehouses Avonmouth

2 Warehouses, Avonmouth
Sir Robert McAlpine

William Haley Engineering provided the structural steel for two grain sheds for The BristolPort Company in Avonmouth Docks, ‘W’ Shed and ‘V’ shed. Both sheds were near identicalportal frame structures, each consisting of 170 tonnes of steel.

Asda, highbridge

Asda, Highbridge
Midas

The new Asda store in Highbridge, Somerset, consisted of 194 tonnes of structural steel,including 58 tonnes of cell beams and 11 tonnes of FLi braces. The portal frame structurewas dominated by cell beams spanning over 30m.

B&Q, Torquay

Asda, Highbridge
Midas

The new B&Q in Torquay featured a double span portal frame with over 180 tonnes of hotrolled steel and 30 tonnes of cold rolled steel. Haley Engineering had to accommodate a 6month delay at site due to ground contamination.

Northcott Warehouse Project

Northcott Warehouse, Exeter, 65T
Bluestone

A beam and column structure made of 65T of structural steelwork urgently required with a 2 week lead in period with 1 week erection – completion 3 weeks from order!

OTHER EXAMPLES

TitlePlaceContractorTonnage

Screwfix

Yeovil

Rok

120

ASDA Refurbishment

Swindon

Carillion

35

Kwik Save

Highbridge

Rok

30

Lemon Quay

Penzance

Kier Western

135

Car Showroom

Eastleigh

Dean & Dyball

160

Borders Books

Cornwall

Midas

230

Oriental Spice Centre

Bristol

Midas

165

Livestock Market

Frome

Carillio

80